Sphere Power: Distributed Battery Storage

Hi, Shidan here, long-time Alts reader.

My startup is called Sphere Power, and some of you might find it rather interesting.

We pre-develop 5 MW battery energy storage system sites (BESS) on underutilized portions of commercial properties and shopping centers.

  • We secure long term ground leases, typically 25 to 30 years

  • Then advance each project through site control, interconnection, permitting, and Notice to Proceed (NTP).

  • Once fully permitted and de-risked, we sell the projects to experienced developers who construct, own, and operate them.

  • Each system charges during off peak periods and discharges during peak demand, supporting grid reliability and more efficient electricity use.

Sphere Power was founded by two entrepreneurs with three decades each of building companies across real estate, capital markets, and technology.

Our CEO co-founded a quantitative trading firm that transacted billions of dollars in US equity volume, and co-founded Viridian Spirits, where he was responsible for legalizing absinthe in the United States after nearly a century of prohibition, later selling the brand to Hood River Distillers.

Our Chairman co-founded and took public GameSquare Esports, now listed on Nasdaq, built the small office phone system that Skype sold as its own product, developed the first Android TV platform with a team that became core contributors to Android, and has built and operated large scale energy intensive data centers.

Watch: Sphere Power overview (2 min)

Where we are right now

We are developing nine sites in New York City for a total of 45 MW.

The economics

Our unit is the site. About $1 million invested per 5 MW site produces $2.5 million or more at sale, on a roughly 18 month cycle from origination to NTP.

We package six sites into 30 MW portfolios, the scale institutional buyers prefer. On that template, roughly $6 million deployed across a portfolio returns $15 million or more, and the portfolio format is what commands buyer attention rather than one off sites.

What is in the queue

Nine sites in New York City, 45 MW total, currently in development. Across our initial sites we project $46.1 million in gross revenue and $28.8 million in NOI for 2027 into early 2028.

Where this goes

Our pipeline stands at 500 MW to 1 GW with top tier landlords, including over 100 MW already under exclusive non definitive MOUs. At the six site portfolio template, that pipeline represents multiples of the current queue.

Storage ITC tax credits preserved under recent legislation are driving strong buyer demand for permitted sites.

Over the next 12 to 18 months we intend to raise $100 million to $200 million to build, own, and operate assets long term, moving from a development margin business to a recurring revenue one.

Learn more

We are commencing our final non institutional round shortly. In roughly three months our sites will be progressed far enough to be treated as collateral assets, which puts us in a position to raise on purely institutional debt terms from that point forward.

Participation is open to accredited investors only, and accredited status must be verified before any investment is accepted.

If the timing is of interest, please DM me, email me, or comment below. I’d be happy to arrange a call to discuss further.

info@spherepower.com

www.spherepower.com

230 Park Avenue, 3rd Floor, New York, NY 10169

Projections are forward looking estimates based on current assumptions and are not guarantees of future results. Any offering will be made only to verified accredited investors pursuant to an applicable exemption from registration, and only through definitive offering documents. This post does not constitute an offer to sell or a solicitation of an offer to buy any security.